Boeing

New problem for Boeing as FAA orders 737 Classic inspections

The Federal Aviation Administration (FAA) said on Friday it was requiring U.S. operators of 143 Boeing Co 737 Classic series airplanes to check for possible wire failures stemming from an investigation into an Indonesia crash in January.

Boeing wins FAA OK for 737 MAX electrical fix, notifies airlines

Boeing Co on Wednesday won approval from U.S. regulators for a fix of an electrical grounding issue that had affected about 100 737 MAX airplanes, clearing the way for their quick return to service after flights were halted in early April, the planemaker said.

Boeing nears fix for 777 engine covers

Boeing Co. is nearing a fix for engine covers like the one that broke apart on a United Airlines 777 jet over Colorado earlier this year, people briefed on the matter said.

Boeing faces new hurdle in 737 MAX electrical grounding issue -sources

U.S. air safety officials have asked Boeing Co to supply fresh analysis and documentation showing numerous 737 MAX subsystems would not be affected by electrical grounding issues first flagged in three areas of the jet in April, two people familiar with the matter told Reuters.

Boeing’s latest 737 MAX problem spurs FAA audit

U.S. air-safety regulators have launched an audit into how a Boeing Co. factory tweak led to a safety problem with some of the plane maker’s 737 MAX aircraft, two years after a pair of fatal crashes prompted other fixes to the jet.

Boeing CEO to push Biden for 'productive dialogue' with China

"Given the importance of the Chinese market to our near-term delivery profile, as well as future orders which influence future production rates, we will continue to engage with leaders in both countries to urge a productive dialogue, reiterating the mutual economic benefits of a strong and prosperous aerospace industry," Calhoun told analysts on the Boeing's first quarter earnings call. "China represents 25% of the global growth in our industry over the next decade."

Boeing reports loss as Air Force One work drags

The aerospace giant is contracted to deliver two converted 747-8 jumbo jets by the end of 2024, but has been forced to switch suppliers for some of the interior work on the planes.